Maths Olympiad Prep

Track / Stage 4 / 182 of 340 #442 of 1964

Problem 442

AMC 12 late, AIME early
Algebra Difficulty 4.8 Find the answer

In Mücheln (Geisel Valley, District of Halle), the longest railway bridge in the GDR was completed. It consists of 7 identical bridge arches.

For one bridge arch, 147 m3147 \mathrm{~m}^{3} of concrete was used. 1 m31 \mathrm{~m}^{3} of concrete has a mass of 24dt24 \mathrm{dt}. How many tons of concrete were needed for the bridge construction? (Round to the nearest whole ton!)

A number or a short expression. Fractions can be typed as 3/2, and spacing doesn't matter.

Next problem →

Official solution

7 (arches) 147 m324dtm3=24696dt\cdot 147 \mathrm{~m}^{3} \cdot 24 \frac{\mathrm{dt}}{\mathrm{m}^{3}}=24696 \mathrm{dt}. In total, approximately 2470 tons of concrete are required.

Source: NuminaMath-1.5, licensed Apache-2.0. Statement reproduced verbatim; metadata (topic, difficulty, ordering) added by this project.